Schneider Charge stations are available in several versions, with cable, single-phase and three-phase, of 7.4 or 11 kW or with T2S socket, which can be powered both single-phase and three-phase and whose power can be adjusted to 7.4 kW, 11 kW or 22 kW.
The new Schneider Charge charging stations are compatible with the OCPP 1.6J communication protocol. These can be managed both through dedicated applications for charging stations, as well as through applications of energy suppliers or photovoltaic system operators, simplifying use.
For more information, please see the Romanian version of this article, here