loader

Enel Green Power: the first two photovoltaic plants are operational in Romania

Enel Green Power (EGP) has connected to the network the first photovoltaic plants of the company in Romania

The two plants, Berceni 1 and Berceni 2 are located in Prahova county, with a total installed capacity of about 19 MW. The units will generate about 29 million kWh per year.

 

Read more in the Romanian version of the article, here.

Authors

foto
ENEL GREEN POWER ROMANIA SRL